IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0054 # 08 Y:1986 08 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $122 $150 Implemented
AT0054 # 09 Y:1986 09 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,814 $1,500 Implemented
LT0075 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $150 Implemented
LT0075 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $595 $400 Implemented
LT0075 # 03 Y:1986 03 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $123 $0 Implemented
LT0075 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $395 $309 Implemented
LT0075 # 05 Y:1986 05 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $532 $200 Implemented
LT0079 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $19,773 $2,150 Implemented
LT0079 # 02 Y:1986 02 1986 COVER OPEN TANKS $3,490 $800 Implemented
LT0079 # 04 Y:1986 04 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,361 $750 Implemented
ST0072 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,729 $90 Implemented
ST0072 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $698 $1,000 Implemented
ST0072 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $807 $537 Implemented
ST0072 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,017 $0 Implemented
ST0072 # 06 Y:1986 06 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $20,785 $36,000 Implemented
ST0072 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,345 $813 Implemented
ST0072 # 08 Y:1986 08 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $463 $486 Implemented
GT0297 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $1,000 Implemented
GT0297 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,120 $1,200 Implemented
GT0297 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,830 $7,920 Implemented
GT0297 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,700 $18,700 Implemented
GT0297 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,209 $3,516 Implemented
LT0063 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40 $33 Implemented
LT0063 # 05 Y:1986 05 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $551 $300 Implemented
LT0063 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,900 $36,421 Implemented