IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,274

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0263 # 03 Y:1985 03 1985 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,318 $0 Implemented
UD0175 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $25,286 $48,000 Implemented
UD0178 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $114 $150 Implemented
ST0042 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,086 $200 Implemented
ST0042 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,863 $2,700 Implemented
ST0042 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $799 $537 Implemented
ST0042 # 07 Y:1985 07 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $599 $70 Implemented
ST0044 # 04 Y:1985 04 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $967 $0 Implemented
ST0044 # 05 Y:1985 05 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $231 $0 Implemented
GT0267 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,200 $600 Implemented
GT0267 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $450 Implemented
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
CO0042 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,853 $645 Implemented
CO0042 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $283 $200 Implemented
CO0042 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,926 $200 Implemented
CO0042 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $18,823 $500 Implemented
CO0042 # 14 Y:1985 14 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $1,459 Implemented
MA0038 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
MA0038 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,400 $2,938 Implemented
MA0038 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $112 Implemented
MA0038 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,867 $500 Implemented
MA0038 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $10,939 $2,229 Implemented
OK0178 # 02 Y:1985 02 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,524 $4,000 Implemented
OK0178 # 03 Y:1985 03 1985 USE RADIANT HEATER FOR SPOT HEATING $1,400 $2,120 Implemented
OK0178 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $178 $150 Implemented