IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0407 # 07 Y:1990 07 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $807 $0 Implemented
GT0408 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $3,771 Implemented
GT0408 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $810 $0 Implemented
RU0092 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $261 $34 Implemented
RU0092 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,505 $500 Implemented
RU0092 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $214 Implemented
RU0092 # 06 Y:1990 06 1990 USE OPTIMUM THICKNESS INSULATION $9,910 $80,000 Implemented
UD0318 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,002 $0 Implemented
UD0318 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,804 $500 Implemented
UD0318 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $300 Implemented
UD0318 # 04 Y:1990 04 1990 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,599 $0 Implemented
UD0318 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,103 $1,680 Implemented
GT0407 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $464 Implemented
GT0407 # 03 Y:1990 03 1990 BURN A LESS EXPENSIVE GRADE OF FUEL $6,760 $0 Implemented
GT0407 # 04 Y:1990 04 1990 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $300 $3,000 Implemented
GT0407 # 05 Y:1990 05 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $940 $0 Implemented
KU0313 # 02 Y:1990 02 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,447 $20,000 Implemented
KU0313 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,866 $80 Implemented
KU0313 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $620 $100 Implemented
RU0090 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $68 Implemented
RU0090 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $348 $350 Implemented
RU0090 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,573 $500 Implemented
RU0090 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $547 $15 Implemented
UD0317 # 01 Y:1990 01 1990 MINIMIZE WATER USAGE $4,564 $4,200 Implemented
WI0087 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $30,592 $500 Implemented