IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0200 # 06 Y:2021 06 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,035 $121,361 Implemented
DL0200 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,182 $0 Implemented
DL0200 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,955 $0 Implemented
DL0180 # 01 Y:2020 01 2020 REDUCE VENTILATION AIR $26,710 $0 Implemented
DL0180 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $980 $120 Implemented
DL0180 # 03 Y:2020 03 2020 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,450 $400 Implemented
DL0180 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,080 $1,900 Implemented
DL0180 # 09 Y:2020 09 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $610 $900 Implemented
DL0043 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,192 $0 Implemented
DL0043 # 03 Y:2009 03 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,472 $3,500 Implemented
DL0043 # 07 Y:2009 07 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,060 $0 Implemented
DL0010 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,305 $225 Implemented
DL0010 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,409 $0 Implemented
DL0010 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,529 $450 Implemented
DL0010 # 01 Y:2007 01 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,964 $2,872 Implemented
LE0182 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,437 $300 Implemented
LE0182 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $577 $0 Implemented
RU0061 # 01 Y:1989 01 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,588 $2,880 Implemented
RU0056 # 01 Y:1989 01 1989 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $5,773 $10,000 Implemented
RU0056 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $664 $0 Implemented
RU0056 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,379 $2,500 Implemented
RU0039 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,285 $0 Implemented
RU0039 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,583 $0 Implemented
RU0039 # 07 Y:1988 07 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,785 $1,260 Implemented
RU0039 # 08 Y:1988 08 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $116 $0 Implemented