Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0200 # 09 Y:2021 | 09 | 2021 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,788 | $5,060 | Not Implemented |
DL0200 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,899 | $200 | Not Implemented |
DL0200 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,955 | $0 | Implemented |
DL0200 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,029 | $0 | Not Implemented |
DL0200 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,182 | $0 | Implemented |
DL0200 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $30,035 | $121,361 | Implemented |
DL0200 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,430 | $36,000 | Not Implemented |
DL0200 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,055 | $3,275 | Not Implemented |
DL0200 # 08 Y:2021 | 08 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $75,171 | $186,000 | Not Implemented |
DL0180 # 02 Y:2020 | 02 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $980 | $120 | Implemented |
DL0180 # 09 Y:2020 | 09 | 2020 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $610 | $900 | Implemented |
DL0180 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,080 | $1,900 | Implemented |
DL0180 # 07 Y:2020 | 07 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $53,460 | $2,400 | Not Implemented |
DL0180 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,050 | $4,000 | Not Implemented |
DL0180 # 05 Y:2020 | 05 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,970 | $5,800 | Not Implemented |
DL0180 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,160 | $1,600 | Not Implemented |
DL0180 # 03 Y:2020 | 03 | 2020 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,450 | $400 | Implemented |
DL0180 # 01 Y:2020 | 01 | 2020 | REDUCE VENTILATION AIR | $26,710 | $0 | Implemented |
DL0043 # 07 Y:2009 | 07 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,060 | $0 | Implemented |
DL0043 # 06 Y:2009 | 06 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $470 | $510 | Not Implemented |
DL0043 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $960 | $2,000 | Not Implemented |
DL0043 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $600 | $950 | Not Implemented |
DL0043 # 03 Y:2009 | 03 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,472 | $3,500 | Implemented |
DL0043 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,192 | $0 | Implemented |
DL0043 # 01 Y:2009 | 01 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,690 | $18,300 | Not Implemented |