Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0256 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,876 | $0 | Not Implemented |
MZ0256 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,589 | $0 | Implemented |
MZ0256 # 04 Y:2018 | 04 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $799 | $10,685 | Not Implemented |
MZ0256 # 05 Y:2018 | 05 | 2018 | USE COMPRESSOR AIR FILTERS | $3,317 | $7,200 | Implemented |
MZ0256 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,110 | $3,000 | Not Implemented |
MZ0256 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $4,834 | $26,380 | Not Implemented |
MZ0256 # 08 Y:2018 | 08 | 2018 | USE SOLAR HEAT TO HEAT WATER | $6,041 | $66,682 | Not Implemented |
SD0568 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,647 | $2,000 | Implemented |
SD0568 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,096 | $0 | Implemented |
SD0568 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $742 | $3,292 | Implemented |
SD0568 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $659 | $2,850 | Not Implemented |
SD0568 # 05 Y:2018 | 05 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $475 | $2,150 | Not Implemented |
WV0561 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $15,007 | $2,522 | Implemented |
WV0561 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,102 | $13,629 | Implemented |
WV0561 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,765 | $1,784 | Implemented |
WV0561 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,742 | $171 | Implemented |
WV0561 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,253 | $6,000 | Not Implemented |
WV0561 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $535 | $1,400 | Implemented |
WV0561 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $696 | Implemented |
WV0561 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $321 | $34 | Implemented |
IC0205 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,600 | $1,769 | Implemented |
IC0205 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,390 | $4,470 | Implemented |
IC0205 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,439 | $0 | Implemented |
IC0205 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $611 | $2,300 | Not Implemented |
IC0205 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $631 | $50 | Not Implemented |