Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0202 # 05 Y:2017 | 05 | 2017 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $3,800 | $1,200 | Not Implemented |
TT0202 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $403 | $678 | Implemented |
TT0202 # 07 Y:2017 | 07 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $197 | $100 | Implemented |
UD0978 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $0 | Not Implemented |
UD0978 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,107 | $1,000 | Not Implemented |
UD0978 # 03 Y:2017 | 03 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,562 | $1,000 | Not Implemented |
UD0978 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79,415 | $79,850 | Not Implemented |
UD0978 # 05 Y:2017 | 05 | 2017 | ADD AREA LIGHTING SWITCHES | $2,220 | $180 | Not Implemented |
UD0978 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $86,982 | $91,480 | Not Implemented |
UD0978 # 07 Y:2017 | 07 | 2017 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $37,937 | $100,000 | Not Implemented |
UD0978 # 08 Y:2017 | 08 | 2017 | COVER OPEN TANKS | $7,466 | $5,000 | Not Implemented |
UD0978 # 09 Y:2017 | 09 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $562 | $0 | Not Implemented |
OR0693 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,809 | $500 | Not Implemented |
OR0693 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,614 | $2,800 | Not Implemented |
OR0693 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,216 | $28,216 | Not Implemented |
OR0693 # 04 Y:2017 | 04 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $45,260 | $144,180 | Not Implemented |
OR0692 # 01 Y:2017 | 01 | 2017 | REDUCE FLUID FLOW RATES | $26,801 | $7,395 | Not Implemented |
OR0692 # 02 Y:2017 | 02 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,636 | $3,060 | Not Implemented |
OR0692 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,299 | $3,670 | Not Implemented |
SF0511 # 01 Y:2017 | 01 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $2,043 | $0 | Implemented |
SF0511 # 02 Y:2017 | 02 | 2017 | REDUCE VENTILATION AIR | $1,680 | $0 | Implemented |
SF0511 # 03 Y:2017 | 03 | 2017 | COVER OPEN TANKS | $2,660 | $1,059 | Implemented |
SF0511 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $824 | $1,526 | Implemented |
SF0511 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,786 | $5,219 | Implemented |
MZ0240 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,020 | $6,000 | Implemented |