IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0024 # 05 Y:2008 05 2008 USE OPTIMUM THICKNESS INSULATION $430 $800 Not Implemented
MZ0027 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,642 $900 Not Implemented
MZ0027 # 02 Y:2008 02 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $514 $1,400 Not Implemented
MZ0027 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $1,400 Not Implemented
MZ0027 # 04 Y:2008 04 2008 USE OPTIMUM THICKNESS INSULATION $76 $300 Not Implemented
MZ0027 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,444 $30,600 Not Implemented
MZ0027 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $9,936 $10,000 Not Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented
MZ0022 # 03 Y:2008 03 2008 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $11,853 $5,458 Implemented
MZ0022 # 04 Y:2008 04 2008 ELIMINATE/REDUCE AN OPERATION $41,408 $0 Implemented
MZ0016 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,548 $2,135 Not Implemented
MZ0016 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,120 Implemented
MZ0016 # 03 Y:2007 03 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,312 $3,000 Not Implemented
MZ0004 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,138 $2,230 Implemented
MZ0004 # 02 Y:2007 02 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $18,457 $3,412 Not Implemented
MZ0004 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,707 $1,300 Not Implemented
MZ0004 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $184 $150 Implemented
MZ0004 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,950 $24,700 Not Implemented
MZ0004 # 06 Y:2007 06 2007 DISCONNECT BALLASTS $19,720 $1,050 Not Implemented
MZ0004 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $6,900 $2,950 Not Implemented
MZ0004 # 08 Y:2007 08 2007 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $56,125 $0 Not Implemented
MZ0004 # 09 Y:2007 09 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,600 $0 Implemented
BD0304 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,468 $1,200 Not Implemented
BD0304 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,428 $1,000 Not Implemented