IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0721 # 03 Y:2016 03 2016 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,710 $360 Not Implemented
AM0721 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $2,410 Implemented
AM0721 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,632 $670 Implemented
AM0721 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $530 $360 Not Implemented
AM0721 # 07 Y:2016 07 2016 USE SYNTHETIC LUBRICANT $420 $0 Not Implemented
OR0681 # 01 Y:2017 01 2017 USE OPTIMUM TEMPERATURE $7,040 $0 Not Implemented
OR0681 # 02 Y:2017 02 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,375 $2,995 Not Implemented
OR0681 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,360 $532 Not Implemented
IP0075 # 01 Y:2016 01 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,060 $475 Not Implemented
IP0075 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,318 $15,186 Not Implemented
IP0075 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $144,133 $37,215 Not Implemented
IP0075 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,278 $17,193 Implemented
IP0075 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88,854 $77,418 Implemented
IP0075 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,646 $9,375 Not Implemented
IP0075 # 07 Y:2016 07 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,086 $107,214 Not Implemented
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $102,120 $52,500 Not Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,070 $3,000 Not Implemented
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
LE0426 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,376 $16,500 Not Implemented
LE0426 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $454 $1,300 Not Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented