Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
440
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0044 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $453 | $30 | Not Implemented |
ST0044 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $967 | $0 | Implemented |
ST0044 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $231 | $0 | Implemented |
ST0044 # 06 Y:1985 | 06 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $110 | $90 | Not Implemented |
ST0044 # 07 Y:1985 | 07 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $496 | $1,100 | Not Implemented |
ST0044 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $221 | $390 | Not Implemented |
ST0044 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $247 | $110 | Not Implemented |
ST0044 # 10 Y:1985 | 10 | 1985 | INSTALL STORM WINDOWS AND DOORS | $225 | $400 | Not Implemented |
ST0044 # 11 Y:1985 | 11 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $294 | $182 | Not Implemented |
ST0044 # 12 Y:1985 | 12 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $609 | $200 | Not Implemented |
ST0032 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $64 | Implemented |
ST0032 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $72 | $42 | Not Implemented |
ST0032 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,640 | $688 | Not Implemented |
ST0032 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $890 | $1,900 | Implemented |
ST0032 # 05 Y:1985 | 05 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,974 | $900 | Not Implemented |
ST0032 # 06 Y:1985 | 06 | 1985 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $2,416 | $5,000 | Not Implemented |
ST0032 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $305 | $0 | Not Implemented |
ST0032 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $380 | $1,140 | Not Implemented |
ST0032 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $503 | $380 | Not Implemented |
ST0014 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,127 | $2,011 | Implemented |
ST0014 # 02 Y:1985 | 02 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,934 | $500 | Implemented |
ST0014 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $722 | $85 | Implemented |
ST0014 # 04 Y:1985 | 04 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,504 | $537 | Implemented |
ST0014 # 05 Y:1985 | 05 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $3,141 | $6,344 | Implemented |
ST0014 # 06 Y:1985 | 06 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,403 | $6,000 | Implemented |