IAC logo
IAC Assessment: ST0032
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product FABRICATED STEEL
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 0
Annual Production 2,500 Tons
Production Hrs. Annual 0
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,890 170,281 kWh $0.12
Natural Gas $735 81 MMBtu $9.07
Fuel Oil #1 $7,920 679 MMBtu $11.66
Fuel Oil #2 $4,021 482 MMBtu $8.34
TOTAL ENERGY COSTS $33,566
RECOMMENDED SAVINGS* $8,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,404
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$514
Cost:
$64
$514 4,103 - - - - $514
4,103
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$72
Cost:
$42
$72 586 - - - - $72
586
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,640
Cost:
$688
$1,640 13,482 - - - - $1,640
13,482
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$890
Cost:
$1,900
$890 - - - - - $890
-
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,974
Cost:
$900
$1,974 16,120 - - - - $1,974
16,120
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT Savings:
$2,416
Cost:
$5,000
$2,416 19,637 - - - - $2,416
19,637
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$305
Cost:
-
$305 2,638 - - - - $305
2,638
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$380
Cost:
$1,140
$550 4,396 $(-170) (-19) - - $550
4,396
kWh
$(-170)
(-19)
MMBtu
-
-
MMBtu
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$503
Cost:
$380
- - - - $503 60 -
-
kWh
-
-
MMBtu
$503
60
MMBtu
TOTAL RECOMMENDED Savings:
$8,694
Cost:
$10,114
$8,361 60,962 $(-170) (-19) $503 60 $8,361
60,962
kWh
$(-170)
(-19)
MMBtu
$503
60
MMBtu
TOTAL IMPLEMENTED Savings:
$1,404
Cost:
$1,964
$1,404 4,103 - - - - $1,404
4,103
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2