Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0381 # 09 Y:2014 | 09 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,210 | $3,000 | Not Implemented |
LE0381 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $6,567 | $9,190 | Implemented |
LE0381 # 11 Y:2014 | 11 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,146 | $3,000 | Not Implemented |
LE0381 # 12 Y:2014 | 12 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,362 | $16,000 | Not Implemented |
LE0381 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,644 | $10,950 | Not Implemented |
LE0381 # 14 Y:2014 | 14 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,535 | $51,625 | Not Implemented |
TT0130 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $29,307 | $44,000 | Implemented |
TT0130 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,560 | $12,150 | Implemented |
TT0130 # 03 Y:2014 | 03 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,677 | $4,500 | Implemented |
TT0130 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,047 | $3,000 | Not Implemented |
TT0130 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,989 | $20,000 | Implemented |
TT0130 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,191 | $6,041 | Implemented |
UA0120 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,979 | $24,613 | Implemented |
UA0120 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,756 | $800 | Not Implemented |
UA0120 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,394 | $5,695 | Implemented |
UA0120 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $4,402 | $160 | Not Implemented |
UA0120 # 05 Y:2014 | 05 | 2014 | MODIFY STARTUP/SHUTDOWN TIMES | $3,313 | $0 | Not Implemented |
UM0444 # 01 Y:2014 | 01 | 2014 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $216,000 | $500,000 | Not Implemented |
UM0444 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $71,820 | $133,000 | Not Implemented |
UM0444 # 03 Y:2014 | 03 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,306 | $80,000 | Not Implemented |
UM0444 # 04 Y:2014 | 04 | 2014 | USE MINIMUM STEAM OPERATING PRESSURE | $6,638 | $5,000 | Implemented |
UM0444 # 05 Y:2014 | 05 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $104,300 | $208,000 | Not Implemented |
NC0511 # 01 Y:2014 | 01 | 2014 | ADOPT IN-HOUSE MATERIAL GENERATION | $53,232 | $125,000 | Not Implemented |
NC0511 # 02 Y:2014 | 02 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $29,302 | $53,000 | Not Implemented |
NC0511 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,743 | $450 | Not Implemented |