Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0010 # 02 Y:2007 | 02 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,440 | $2,500 | Not Implemented |
DL0010 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $622 | Not Implemented |
DL0010 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
DL0010 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,529 | $450 | Implemented |
DL0010 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,305 | $225 | Implemented |
DL0010 # 01 Y:2007 | 01 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,964 | $2,872 | Implemented |
DL0010 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $454 | $524 | Not Implemented |
LE0182 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,437 | $300 | Implemented |
LE0182 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,756 | $94,677 | Not Implemented |
LE0182 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $577 | $0 | Implemented |
LE0182 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $9,794 | $9,794 | Not Implemented |
LE0182 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,612 | $10,336 | Not Implemented |
LE0182 # 01 Y:2004 | 01 | 2004 | USE OPTIMUM THICKNESS INSULATION | $12,028 | $752 | Not Implemented |
RU0061 # 01 Y:1989 | 01 | 1989 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,588 | $2,880 | Implemented |
RU0061 # 02 Y:1989 | 02 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $785 | $203 | Not Implemented |
RU0061 # 03 Y:1989 | 03 | 1989 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,320 | $0 | Not Implemented |
RU0056 # 04 Y:1989 | 04 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,020 | $2,940 | Not Implemented |
RU0056 # 03 Y:1989 | 03 | 1989 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,379 | $2,500 | Implemented |
RU0056 # 02 Y:1989 | 02 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $664 | $0 | Implemented |
RU0056 # 01 Y:1989 | 01 | 1989 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $5,773 | $10,000 | Implemented |
RU0039 # 06 Y:1988 | 06 | 1988 | INSULATE BARE EQUIPMENT | $248 | $501 | Not Implemented |
RU0039 # 05 Y:1988 | 05 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,235 | $1,040 | Not Implemented |
RU0039 # 04 Y:1988 | 04 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,583 | $0 | Implemented |
RU0039 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,285 | $0 | Implemented |
RU0039 # 02 Y:1988 | 02 | 1988 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $722 | $800 | Not Implemented |