Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
558
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0402 # 02 Y:2022 | 02 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,776 | $580 | Not Implemented |
MI0402 # 03 Y:2022 | 03 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,485 | $12,386 | Not Implemented |
MI0402 # 07 Y:2022 | 07 | 2022 | USE COMPRESSOR AIR FILTERS | $934 | $580 | Implemented |
MI0402 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,050 | $1,980 | Implemented |
MI0402 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,039 | $5,244 | Implemented |
MI0402 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,196 | $5,530 | Not Implemented |
MI0402 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,047 | $2,100 | Implemented |
MI0401 # 03 Y:2022 | 03 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,485 | $25,433 | Implemented |
MI0401 # 05 Y:2022 | 05 | 2022 | METER WASTE WATER | $3,900 | $900 | Not Implemented |
MI0401 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,026 | $580 | Implemented |
MI0401 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,022 | $2,050 | Not Implemented |
MI0401 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $8,603 | $24,100 | Not Implemented |
MI0401 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,280 | $2,998 | Not Implemented |
MI0401 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,273 | $1,930 | Implemented |
MI0399 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,245 | $70,400 | Implemented |
MI0399 # 07 Y:2021 | 07 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,286 | $4,468 | Implemented |
MI0399 # 06 Y:2021 | 06 | 2021 | METER WASTE WATER | $4,166 | $900 | Not Implemented |
MI0399 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,670 | Implemented |
MI0399 # 01 Y:2021 | 01 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $115,960 | $157,500 | Not Implemented |
MI0399 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,060 | $240,000 | Implemented |
MI0399 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,020 | $320 | Implemented |
MI0387 # 08 Y:2021 | 08 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,060 | $2,791 | Not Implemented |
MI0387 # 01 Y:2021 | 01 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $12,419 | $16,940 | Implemented |
MI0387 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $1,412 | $780 | Implemented |
MI0387 # 10 Y:2021 | 10 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,900 | Implemented |