Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
548
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0401 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,026 | $580 | Implemented |
MI0401 # 05 Y:2022 | 05 | 2022 | METER WASTE WATER | $3,900 | $900 | Not Implemented |
MI0401 # 06 Y:2022 | 06 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,022 | $2,050 | Not Implemented |
MI0401 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $8,603 | $24,100 | Not Implemented |
MI0399 # 06 Y:2021 | 06 | 2021 | METER WASTE WATER | $4,166 | $900 | Not Implemented |
MI0399 # 07 Y:2021 | 07 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,286 | $4,468 | Implemented |
MI0399 # 01 Y:2021 | 01 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $115,960 | $157,500 | Not Implemented |
MI0399 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $54,060 | $240,000 | Implemented |
MI0399 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,245 | $70,400 | Implemented |
MI0399 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,020 | $320 | Implemented |
MI0399 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,405 | $1,670 | Implemented |
MI0387 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,595 | $1,980 | Implemented |
MI0387 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,862 | $9,016 | Not Implemented |
MI0387 # 06 Y:2021 | 06 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,824 | $120 | Implemented |
MI0387 # 05 Y:2021 | 05 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,971 | $11,975 | Not Implemented |
MI0387 # 08 Y:2021 | 08 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,060 | $2,791 | Not Implemented |
MI0387 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $1,412 | $780 | Implemented |
MI0387 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,993 | $4,308 | Implemented |
MI0387 # 10 Y:2021 | 10 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,900 | Implemented |
MI0387 # 01 Y:2021 | 01 | 2021 | AIR CONDITION ONLY SPACE NECESSARY | $12,419 | $16,940 | Implemented |
MI0387 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $4,326 | $10,320 | Not Implemented |
UF0561 # 12 Y:2020 | 12 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $854 | $800 | Implemented |
UF0561 # 09 Y:2020 | 09 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $0 | Implemented |
UF0561 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,219 | $20,000 | Implemented |
UF0561 # 11 Y:2020 | 11 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,418 | $5,192 | Implemented |