IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0086 # 02 Y:2012 02 2012 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,479 $500 Implemented
DL0086 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $6,400 $100 Implemented
DL0086 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,740 $3,250 Implemented
DL0086 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,250 $9,900 Not Implemented
DL0086 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $4,000 Implemented
DL0086 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,857 $2,500 Not Implemented
DL0086 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $466 $3,100 Not Implemented
DL0086 # 11 Y:2012 11 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $493 $450 Not Implemented
DL0086 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $8,850 $10,000 Not Implemented
DL0086 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,800 $9,700 Not Implemented
DL0086 # 14 Y:2012 14 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,250 $300 Not Implemented
DL0084 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $1,825 $500 Implemented
DL0084 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,216 $35,000 Not Implemented
DL0084 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,919 $20 Not Implemented
DL0084 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,252 $20 Not Implemented
DL0050 # 03 Y:2010 03 2010 INSTALL SET-BACK TIMERS $1,236 $300 Not Implemented
DL0050 # 04 Y:2010 04 2010 COVER OPEN TANKS $263 $275 Not Implemented
DL0050 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,850 $34,600 Implemented
DL0050 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $300 Implemented
DL0050 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,623 $100 Not Implemented
LE0187 # 07 Y:2004 07 2004 USE SYNTHETIC LUBRICANT $810 $500 Not Implemented
LE0187 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $921 $500 Implemented
LE0187 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,975 $15,000 Not Implemented
LE0187 # 04 Y:2004 04 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,271 $40,064 Not Implemented
LE0187 # 03 Y:2004 03 2004 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $5,383 $9,360 Not Implemented