IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

295

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0951 # 03 Y:2020 03 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $18,092 $2,000 Not Implemented
GT0951 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126,097 $4,500 Implemented
GT0951 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $79,957 $675 Implemented
GT0951 # 09 Y:2020 09 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $201,113 $1,989,215 Not Implemented
SF0561 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,397 $525 Not Implemented
SF0561 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,203 $110 Not Implemented
SF0561 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $3,116 $1,412 Implemented
SF0561 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $3,959 Not Implemented
SF0561 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,548 $4,226 Implemented
SF0561 # 06 Y:2020 06 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,263 $18,437 Not Implemented
SF0561 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $35,550 $236,909 Implemented
MI0378 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $1,344 $1,042 Not Implemented
MI0378 # 07 Y:2020 07 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,694 $1,195 Implemented
MI0378 # 10 Y:2020 10 2020 ISOLATE HOT OR COLD EQUIPMENT $671 $560 Not Implemented
MI0378 # 09 Y:2020 09 2020 USE PHOTOCELL CONTROLS $981 $1,141 Not Implemented
MI0378 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,828 $480 Implemented
MI0378 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,840 $2,673 Not Implemented
MI0378 # 03 Y:2020 03 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $7,580 $6,182 Not Implemented
MI0378 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,737 $11,160 Implemented
MI0378 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,502 $2,100 Implemented
MI0378 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,909 $1,980 Implemented
MZ0296 # 07 Y:2020 07 2020 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $57,876 $199,418 Not Implemented
MZ0296 # 06 Y:2020 06 2020 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $100,865 $197,145 Not Implemented
MZ0296 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $669 $200 Not Implemented
MZ0296 # 08 Y:2020 08 2020 INSTALL OCCUPANCY SENSORS $336 $360 Not Implemented