IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,750

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0025 # 02 Y:1995 02 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,321 $8,450 Not Implemented
BD0025 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $400 Implemented
BD0025 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,558 $60 Implemented
BD0025 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,500 Implemented
BD0025 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,685 $1,050 Implemented
BD0025 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,086 $712 Implemented
MO0138 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $40,772 $0 Implemented
MO0138 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,269 $848 Implemented
MO0138 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $19,282 $4,373 Not Implemented
MO0138 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,554 $46,209 Implemented
MO0138 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,489 $4,070 Not Implemented
MO0138 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,397 $3,220 Not Implemented
MO0138 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,389 $16,600 Implemented
MO0138 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $536 Implemented
MO0137 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,221 $1,250 Not Implemented
MO0137 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,890 $100 Implemented
MO0137 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $12,445 Implemented
MO0137 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $359 Implemented
MO0137 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,059 $4,433 Implemented
MO0137 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $1,195 Implemented
BD0020 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $30,091 $52,250 Implemented
BD0020 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,313 $10,254 Not Implemented
BD0020 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,172 $7,470 Not Implemented
BD0020 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,662 $9,150 Not Implemented
BD0018 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $1,130 Not Implemented