Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,133
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0166 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $509 | $1,800 | Not Implemented |
ME0166 # 07 Y:1995 | 07 | 1995 | RECOVER AND REUSE COOLING WATER | $1,239 | $2,650 | Not Implemented |
ME0166 # 08 Y:1995 | 08 | 1995 | MINIMIZE WATER USAGE | $1,028 | $570 | Not Implemented |
OK0471 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $609 | $360 | Implemented |
OK0471 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,051 | $80 | Implemented |
OK0471 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,650 | $6,490 | Implemented |
OK0471 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,762 | $10,597 | Implemented |
OK0471 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $764 | $410 | Implemented |
OK0471 # 06 Y:1995 | 06 | 1995 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $5,017 | $5,994 | Not Implemented |
MA0339 # 01 Y:1995 | 01 | 1995 | BURN A LESS EXPENSIVE GRADE OF FUEL | $4,128 | $1,860 | Implemented |
MA0339 # 02 Y:1995 | 02 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,027 | $3,770 | Implemented |
MA0339 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $653 | $0 | Implemented |
MA0339 # 04 Y:1995 | 04 | 1995 | INSULATE BARE EQUIPMENT | $504 | $1,010 | Not Implemented |
MA0339 # 05 Y:1995 | 05 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $57,939 | $118,450 | Not Implemented |
MA0339 # 06 Y:1995 | 06 | 1995 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $23,990 | $500 | Not Implemented |
MA0339 # 07 Y:1995 | 07 | 1995 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $824 | $3,000 | Not Implemented |
OK0472 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,844 | $19,582 | Implemented |
OK0472 # 02 Y:1995 | 02 | 1995 | INSTALL SET-BACK TIMERS | $4,881 | $775 | Implemented |
OK0472 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,501 | $5,713 | Implemented |
OK0472 # 04 Y:1995 | 04 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,180 | $0 | Not Implemented |
OK0472 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,174 | $538 | Not Implemented |
OK0472 # 06 Y:1995 | 06 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,475 | $4,275 | Implemented |
OK0472 # 07 Y:1995 | 07 | 1995 | OPTIMIZE PLANT POWER FACTOR | $480 | $4,180 | Not Implemented |
WI0238 # 01 Y:1995 | 01 | 1995 | INSTALL EFFICIENT RECTIFIERS | $68,726 | $81,000 | Not Implemented |
WI0238 # 02 Y:1995 | 02 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,411 | $2,500 | Not Implemented |