IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0014 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $351 $450 Implemented
MA0194 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $503 $79 Implemented
MA0194 # 02 Y:1990 02 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $25,980 $38,667 Implemented
MA0194 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $89 Implemented
MA0194 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $2,541 $7,188 Not Implemented
MA0194 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $520 $223 Implemented
MA0194 # 06 Y:1990 06 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $2,174 $3,875 Not Implemented
MA0194 # 07 Y:1990 07 1990 HEAT WATER WITH EXHAUST HEAT $656 $494 Implemented
MA0186 # 01 Y:1990 01 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,664 $5,000 Implemented
MA0186 # 02 Y:1990 02 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,372 $5,957 Not Implemented
MA0186 # 03 Y:1990 03 1990 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,848 $500 Implemented
MA0186 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $9,634 Implemented
MA0186 # 05 Y:1990 05 1990 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,130 $1,195 Implemented
MA0186 # 06 Y:1990 06 1990 COVER OPEN TANKS $1,262 $229 Implemented
KU0317 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $206 Implemented
KU0317 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $240 Implemented
KU0317 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,311 $1,400 Implemented
KU0317 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $453 $0 Not Implemented
KU0317 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $571 $950 Not Implemented
KU0321 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,845 $10,000 Implemented
KU0321 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $8,554 $10,000 Implemented
KU0321 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,810 $0 Implemented
KU0321 # 04 Y:1990 04 1990 INSTALL TURBULATORS $1,981 $1,000 Implemented
KU0321 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $601 $2,322 Not Implemented
KU0321 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $127 Implemented