IAC logo
IAC Assessment: SD0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1991
Principal Product METAL CABINETS & LOCKERS
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 150,000 Pieces
Production Hrs. Annual 435
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,233 944,900 kWh $0.09
Natural Gas $47,396 9,280 MMBtu $5.11
TOTAL ENERGY COSTS $134,629
RECOMMENDED SAVINGS* $15,457 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$490
Cost:
$605
$490 5,275 - - - - $490
5,275
kWh
-
-
MMBtu
-
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$424
Cost:
$700
- - $424 83 - - -
-
kWh
$424
83
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,921
Cost:
$3,500
- - $1,921 376 - - -
-
kWh
$1,921
376
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,292
Cost:
$3,750
$2,086 22,567 - - $206 - $2,086
22,567
kWh
-
-
MMBtu
$206
-
$
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$5,786
Cost:
$7,500
$5,451 59,203 - - $335 - $5,451
59,203
kWh
-
-
MMBtu
$335
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$405
Cost:
$1,672
$355 4,982 - - $50 - $355
4,982
kWh
-
-
MMBtu
$50
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16
Cost:
$21
$16 293 - - - - $16
293
kWh
-
-
MMBtu
-
-
$
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$3,470
Cost:
$600
$3,470 37,515 - - - - $3,470
37,515
kWh
-
-
MMBtu
-
-
$
09: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$653
Cost:
$1,500
$487 5,275 $166 32 - - $487
5,275
kWh
$166
32
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,457
Cost:
$19,848
$12,355 135,110 $2,511 491 $591 - $12,355
135,110
kWh
$2,511
491
MMBtu
$591
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes