IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0313 # 05 Y:1990 05 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $104 $0 Not Implemented
GT0406 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $2,430 Not Implemented
GT0406 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,787 $14,000 Not Implemented
GT0406 # 03 Y:1990 03 1990 USE OPTIMUM THICKNESS INSULATION $5,930 $98 Not Implemented
GT0406 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,920 $815 Not Implemented
GT0406 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $3,390 $0 Not Implemented
GT0406 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,125 $1,633 Not Implemented
GT0406 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,678 $21,372 Not Implemented
GT0407 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $464 Implemented
GT0407 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $198 $422 Not Implemented
GT0407 # 03 Y:1990 03 1990 BURN A LESS EXPENSIVE GRADE OF FUEL $6,760 $0 Implemented
GT0407 # 04 Y:1990 04 1990 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $300 $3,000 Implemented
GT0407 # 05 Y:1990 05 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $940 $0 Implemented
GT0407 # 06 Y:1990 06 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $290 $1,200 Not Implemented
RU0087 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,222 $9,000 Not Implemented
RU0087 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,858 $68 Not Implemented
RU0087 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,918 $650 Not Implemented
RU0087 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
RU0087 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,717 $3,492 Not Implemented
RU0087 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,877 $1,200 Not Implemented
RU0087 # 07 Y:1990 07 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $626 $170 Not Implemented
RU0087 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $150 $500 Not Implemented
CO0181 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $25,900 $28,000 Not Implemented
CO0181 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $1,000 Implemented
CO0181 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $1,630 Implemented