IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19,961

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0324 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $300 Implemented
TN0324 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $906 $585 Implemented
TN0324 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,612 $4,800 Implemented
TN0324 # 04 Y:1987 04 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,386 $2,836 Not Implemented
TN0324 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $1,120 Implemented
TN0324 # 06 Y:1987 06 1987 ADJUST VENTS TO MINIMIZE ENERGY USE $967 $0 Implemented
TN0324 # 07 Y:1987 07 1987 IMPROVE LUBRICATION PRACTICES $951 $1,500 Not Implemented
TN0324 # 08 Y:1987 08 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $822 $1,360 Implemented
TN0324 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $192 Implemented
TN0324 # 10 Y:1987 10 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $139 $45 Not Implemented
UD0247 # 01 Y:1988 01 1988 COMBINE UTILITY METERS $1,416 $3,000 Not Implemented
UD0247 # 02 Y:1988 02 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,816 $0 Implemented
UD0247 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $818 $2,000 Not Implemented
UD0247 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $1,500 Implemented
UD0247 # 05 Y:1988 05 1988 OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS $1,405 $76 Implemented
TN0326 # 01 Y:1987 01 1987 REPAIR AND ELIMINATE STEAM LEAKS $3,984 $300 Implemented
TN0326 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $4,339 $2,160 Implemented
TN0326 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,432 $1,442 Implemented
TN0326 # 04 Y:1987 04 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,072 $960 Implemented
TN0326 # 05 Y:1987 05 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,918 $4,980 Not Implemented
TN0326 # 06 Y:1987 06 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,024 $6,761 Not Implemented
TN0326 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,749 $0 Implemented
TN0326 # 08 Y:1987 08 1987 IMPROVE LUBRICATION PRACTICES $1,666 $0 Not Implemented
TN0326 # 09 Y:1987 09 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,989 $600 Implemented
AM0014 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $945 $300 Implemented