IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $178 Implemented
RU0002 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $9,437 $6,204 Not Implemented
RU0002 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,751 $0 Implemented
MA0087 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $92,624 $210,000 Not Implemented
MA0087 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,475 $247 Not Implemented
MA0087 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $927 $100 Not Implemented
MA0087 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,245 $4,500 Not Implemented
MA0087 # 05 Y:1987 05 1987 INSTALL STORM WINDOWS AND DOORS $1,272 $3,530 Not Implemented
MA0087 # 06 Y:1987 06 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,589 $2,249 Not Implemented
MA0087 # 07 Y:1987 07 1987 OPTIMIZE PLANT POWER FACTOR $864 $3,200 Not Implemented
MA0087 # 08 Y:1987 08 1987 AIR CONDITION ONLY SPACE NECESSARY $20,849 $1,360 Not Implemented
MA0087 # 09 Y:1987 09 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,536 $1,350 Implemented
UD0232 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,451 $0 Not Implemented
UD0232 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $3,368 $795 Implemented
UD0232 # 03 Y:1987 03 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,586 $10,000 Not Implemented
UD0232 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,488 $1,700 Implemented
UD0232 # 05 Y:1987 05 1987 REDUCE GLAZED AREAS IN BUILDINGS $3,241 $8,860 Not Implemented
OK0218 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $291 $255 Implemented
OK0218 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,933 $1,500 Implemented
OK0218 # 03 Y:1987 03 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $1,296 $965 Not Implemented
OK0218 # 04 Y:1987 04 1987 COVER OPEN TANKS $7,769 $3,608 Not Implemented
OK0218 # 05 Y:1987 05 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $780 $465 Implemented
OK0218 # 06 Y:1987 06 1987 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,136 $503 Implemented
OK0218 # 07 Y:1987 07 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,085 $52,000 Not Implemented
OK0216 # 01 Y:1987 01 1987 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,049 $1,300 Not Implemented