IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0187 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
KU0189 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,480 $6,000 Implemented
KU0189 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,071 $8,000 Implemented
KU0189 # 03 Y:1986 03 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,597 $500 Not Implemented
KU0189 # 04 Y:1986 04 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,273 $5,000 Not Implemented
KU0189 # 05 Y:1986 05 1986 USE MINIMUM STEAM OPERATING PRESSURE $775 $0 Implemented
KU0189 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $485 $0 Not Implemented
KU0189 # 07 Y:1986 07 1986 INSULATE BARE EQUIPMENT $2,648 $5,000 Not Implemented
KU0189 # 08 Y:1986 08 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,247 $780 Implemented
KU0189 # 09 Y:1986 09 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,871 $6,700 Not Implemented
KU0189 # 10 Y:1986 10 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $414 Implemented
KU0189 # 11 Y:1986 11 1986 REPAIR AND ELIMINATE STEAM LEAKS $191 $200 Implemented
KU0189 # 12 Y:1986 12 1986 IMPROVE LUBRICATION PRACTICES $148 $260 Not Implemented
UD0188 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,133 $13,400 Implemented
UD0188 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,279 $0 Not Implemented
MA0051 # 01 Y:1986 01 1986 INSTALL SET-BACK TIMERS $377 $75 Implemented
MA0051 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,235 $248 Implemented
MA0051 # 03 Y:1986 03 1986 REPAIR OR REPLACE STEAM TRAPS $14,400 $650 Implemented
MA0051 # 04 Y:1986 04 1986 COVER OPEN TANKS $12,580 $1,239 Not Implemented
MA0051 # 05 Y:1986 05 1986 INSTALL EFFICIENT RECTIFIERS $8,784 $40,000 Implemented
KU0185 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,660 $10,929 Implemented
KU0185 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,869 $210 Not Implemented
KU0185 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,145 $1,380 Implemented
KU0185 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $315 $60 Implemented
KU0185 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $80 Implemented