Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,092
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0178 # 04 Y:1985 | 04 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,380 | $100 | Not Implemented |
UD0178 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $225 | Not Implemented |
UD0178 # 06 Y:1985 | 06 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $114 | $150 | Implemented |
TS0028 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,831 | $0 | Not Implemented |
TS0028 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,428 | $0 | Not Implemented |
TS0028 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $811 | $300 | Not Implemented |
TS0029 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $65,767 | $60,000 | Not Implemented |
TS0029 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,874 | $100 | Not Implemented |
TS0029 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,514 | $2,892 | Not Implemented |
GT0267 # 01 Y:1985 | 01 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,275 | $3,300 | Not Implemented |
GT0267 # 02 Y:1985 | 02 | 1985 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,200 | $16,250 | Not Implemented |
GT0267 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $3,200 | $600 | Implemented |
GT0267 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,640 | $450 | Implemented |
GT0267 # 05 Y:1985 | 05 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,968 | $3,547 | Not Implemented |
GT0267 # 06 Y:1985 | 06 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $1,860 | $1,000 | Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
ST0042 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,822 | $810 | Not Implemented |
ST0042 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,086 | $200 | Implemented |
ST0042 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $350 | $110 | Not Implemented |
ST0042 # 04 Y:1985 | 04 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,863 | $2,700 | Implemented |
ST0042 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $799 | $537 | Implemented |
ST0042 # 06 Y:1985 | 06 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $1,762 | $1,640 | Not Implemented |
ST0042 # 07 Y:1985 | 07 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $599 | $70 | Implemented |
ST0042 # 08 Y:1985 | 08 | 1985 | USE SOLAR HEAT TO HEAT WATER | $447 | $0 | Not Implemented |
ST0044 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,000 | $774 | Not Implemented |