Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1987
Principal Product FAUCETS
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 2,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,635 1,691,090 kWh $0.07
Natural Gas $63,957 13,479 MMBtu $4.74
TOTAL ENERGY COSTS $176,592
RECOMMENDED SAVINGS* $4,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,730
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$562
Cost:
-
$562 8,499 - - - - $562
8,499
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$269
Cost:
-
$269 4,103 - - - - $269
4,103
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$644
Cost:
$701
$644 9,672 - - - - $644
9,672
kWh
-
-
MMBtu
-
-
$
04: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$122
Cost:
-
$122 1,758 - - - - $122
1,758
kWh
-
-
MMBtu
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,563
Cost:
$5,000
$2,563 - - - - - $2,563
-
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$695
Cost:
$500
- - $945 199 $(-250) - -
-
kWh
$945
199
MMBtu
$(-250)
-
$
TOTAL RECOMMENDED Savings:
$4,855
Cost:
$6,201
$4,160 24,032 $945 199 $(-250) - $4,160
24,032
kWh
$945
199
MMBtu
$(-250)
-
$
TOTAL IMPLEMENTED Savings:
$1,730
Cost:
$1,201
$1,035 15,533 $945 199 $(-250) - $1,035
15,533
kWh
$945
199
MMBtu
$(-250)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes