Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0172 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,203 | $150 | Implemented |
UD0172 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,225 | $50 | Implemented |
UD0172 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $123 | Implemented |
UD0172 # 04 Y:1985 | 04 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $546 | $0 | Implemented |
MA0038 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,045 | $300 | Implemented |
MA0038 # 02 Y:1985 | 02 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,400 | $2,938 | Implemented |
MA0038 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $892 | $112 | Implemented |
MA0038 # 04 Y:1985 | 04 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,867 | $500 | Implemented |
MA0038 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,939 | $2,229 | Implemented |
MA0038 # 06 Y:1985 | 06 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,662 | $3,816 | Not Implemented |
LT0025 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $154 | $300 | Implemented |
LT0025 # 02 Y:1985 | 02 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $537 | $670 | Implemented |
LT0025 # 03 Y:1985 | 03 | 1985 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,134 | $500 | Implemented |
LT0025 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $531 | $400 | Implemented |
ST0032 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $64 | Implemented |
ST0032 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $72 | $42 | Not Implemented |
ST0032 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,640 | $688 | Not Implemented |
ST0032 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $890 | $1,900 | Implemented |
ST0032 # 05 Y:1985 | 05 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,974 | $900 | Not Implemented |
ST0032 # 06 Y:1985 | 06 | 1985 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $2,416 | $5,000 | Not Implemented |
ST0032 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $305 | $0 | Not Implemented |
ST0032 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $380 | $1,140 | Not Implemented |
ST0032 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $503 | $380 | Not Implemented |
UD0168 # 01 Y:1985 | 01 | 1985 | INSTALL SET-BACK TIMERS | $2,610 | $1,000 | Implemented |
UD0168 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $688 | $300 | Not Implemented |