IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0172 # 01 Y:1985 01 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,203 $150 Implemented
UD0172 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,225 $50 Implemented
UD0172 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $123 Implemented
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
MA0038 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
MA0038 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $3,400 $2,938 Implemented
MA0038 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $112 Implemented
MA0038 # 04 Y:1985 04 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,867 $500 Implemented
MA0038 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $10,939 $2,229 Implemented
MA0038 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $2,662 $3,816 Not Implemented
LT0025 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $154 $300 Implemented
LT0025 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $537 $670 Implemented
LT0025 # 03 Y:1985 03 1985 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,134 $500 Implemented
LT0025 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $531 $400 Implemented
ST0032 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $514 $64 Implemented
ST0032 # 02 Y:1985 02 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $72 $42 Not Implemented
ST0032 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,640 $688 Not Implemented
ST0032 # 04 Y:1985 04 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $890 $1,900 Implemented
ST0032 # 05 Y:1985 05 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,974 $900 Not Implemented
ST0032 # 06 Y:1985 06 1985 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $2,416 $5,000 Not Implemented
ST0032 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $305 $0 Not Implemented
ST0032 # 08 Y:1985 08 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $380 $1,140 Not Implemented
ST0032 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $503 $380 Not Implemented
UD0168 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $2,610 $1,000 Implemented
UD0168 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $688 $300 Not Implemented