Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0155 # 02 Y:1985 | 02 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,311 | $278 | Implemented |
KU0155 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $2,931 | $0 | Implemented |
KU0155 # 04 Y:1985 | 04 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,855 | $0 | Not Implemented |
KU0155 # 05 Y:1985 | 05 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,055 | $20 | Not Implemented |
KU0155 # 06 Y:1985 | 06 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $851 | $300 | Implemented |
KU0155 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $50 | Not Implemented |
KU0155 # 08 Y:1985 | 08 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $305 | $20 | Not Implemented |
KU0155 # 09 Y:1985 | 09 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,418 | $0 | Implemented |
KU0155 # 10 Y:1985 | 10 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $1,280 | $975 | Not Implemented |
KU0155 # 11 Y:1985 | 11 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $827 | $300 | Implemented |
KU0155 # 12 Y:1985 | 12 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23 | $0 | Implemented |
KU0155 # 13 Y:1985 | 13 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $434 | $0 | Not Implemented |
KU0155 # 14 Y:1985 | 14 | 1985 | USE RADIANT HEATER FOR SPOT HEATING | $112 | $25 | Not Implemented |
KU0155 # 15 Y:1985 | 15 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $393 | $0 | Implemented |
KU0155 # 16 Y:1985 | 16 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $150 | $0 | Implemented |
CO0021 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $474 | $219 | Implemented |
CO0021 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $440 | $500 | Implemented |
CO0021 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $811 | $200 | Implemented |
CO0021 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $149 | $200 | Implemented |
CO0021 # 05 Y:1985 | 05 | 1985 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,675 | $0 | Implemented |
CO0021 # 06 Y:1985 | 06 | 1985 | REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES | $3,907 | $1,000 | Not Implemented |
CO0021 # 07 Y:1985 | 07 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $532 | $500 | Implemented |
CO0021 # 08 Y:1985 | 08 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $50 | Implemented |
CO0021 # 09 Y:1985 | 09 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $174 | $100 | Implemented |
CO0021 # 10 Y:1985 | 10 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $467 | $100 | Implemented |