IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0155 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,311 $278 Implemented
KU0155 # 03 Y:1985 03 1985 IMPROVE LUBRICATION PRACTICES $2,931 $0 Implemented
KU0155 # 04 Y:1985 04 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,855 $0 Not Implemented
KU0155 # 05 Y:1985 05 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,055 $20 Not Implemented
KU0155 # 06 Y:1985 06 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $851 $300 Implemented
KU0155 # 07 Y:1985 07 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $50 Not Implemented
KU0155 # 08 Y:1985 08 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $20 Not Implemented
KU0155 # 09 Y:1985 09 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,418 $0 Implemented
KU0155 # 10 Y:1985 10 1985 INSTALL AUTOMATIC STACK DAMPER $1,280 $975 Not Implemented
KU0155 # 11 Y:1985 11 1985 INSTALL TIMERS AND/OR THERMOSTATS $827 $300 Implemented
KU0155 # 12 Y:1985 12 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23 $0 Implemented
KU0155 # 13 Y:1985 13 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $434 $0 Not Implemented
KU0155 # 14 Y:1985 14 1985 USE RADIANT HEATER FOR SPOT HEATING $112 $25 Not Implemented
KU0155 # 15 Y:1985 15 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $393 $0 Implemented
KU0155 # 16 Y:1985 16 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $150 $0 Implemented
CO0021 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $219 Implemented
CO0021 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $440 $500 Implemented
CO0021 # 03 Y:1985 03 1985 INSULATE BARE EQUIPMENT $811 $200 Implemented
CO0021 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $149 $200 Implemented
CO0021 # 05 Y:1985 05 1985 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,675 $0 Implemented
CO0021 # 06 Y:1985 06 1985 REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES $3,907 $1,000 Not Implemented
CO0021 # 07 Y:1985 07 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $532 $500 Implemented
CO0021 # 08 Y:1985 08 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $327 $50 Implemented
CO0021 # 09 Y:1985 09 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $174 $100 Implemented
CO0021 # 10 Y:1985 10 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $100 Implemented