Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,208
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0153 # 01 Y:1985 | 01 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $14,805 | $16,000 | Not Implemented |
UD0153 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,217 | $0 | Not Implemented |
UD0153 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,255 | $2,450 | Implemented |
UD0153 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,666 | $16,000 | Implemented |
GT0248 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $722 | $581 | Implemented |
GT0248 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,090 | $222 | Implemented |
GT0248 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $937 | $125 | Implemented |
GT0248 # 04 Y:1985 | 04 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,830 | $7,000 | Not Implemented |
GT0248 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,875 | $500 | Implemented |
GT0248 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $97,891 | $0 | Implemented |
GT0248 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,990 | $12,500 | Not Implemented |
OK0153 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89 | $75 | Implemented |
OK0153 # 02 Y:1985 | 02 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $580 | $300 | Not Implemented |
OK0153 # 03 Y:1985 | 03 | 1985 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $104 | $259 | Not Implemented |
OK0153 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $282 | $130 | Not Implemented |
OK0153 # 05 Y:1985 | 05 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,170 | $7,500 | Not Implemented |
PV0001 # 01 Y:1985 | 01 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,125 | $1,659 | Not Implemented |
PV0001 # 02 Y:1985 | 02 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $499 | $666 | Not Implemented |
PV0001 # 03 Y:1985 | 03 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,276 | $1,271 | Not Implemented |
PV0002 # 01 Y:1985 | 01 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $375 | $79 | Not Implemented |
PV0002 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,792 | $10 | Not Implemented |
PV0002 # 03 Y:1985 | 03 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,393 | $0 | Not Implemented |
MA0016 # 01 Y:1985 | 01 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $7,772 | $5,000 | Implemented |
MA0016 # 02 Y:1985 | 02 | 1985 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,480 | $3,178 | Implemented |
MA0016 # 03 Y:1985 | 03 | 1985 | INSTALL SET-BACK TIMERS | $453 | $101 | Implemented |