IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0153 # 01 Y:1985 01 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,805 $16,000 Not Implemented
UD0153 # 02 Y:1985 02 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,217 $0 Not Implemented
UD0153 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $2,450 Implemented
UD0153 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,666 $16,000 Implemented
GT0248 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $722 $581 Implemented
GT0248 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $222 Implemented
GT0248 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $937 $125 Implemented
GT0248 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,830 $7,000 Not Implemented
GT0248 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,875 $500 Implemented
GT0248 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $97,891 $0 Implemented
GT0248 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,990 $12,500 Not Implemented
OK0153 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $75 Implemented
OK0153 # 02 Y:1985 02 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $580 $300 Not Implemented
OK0153 # 03 Y:1985 03 1985 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $104 $259 Not Implemented
OK0153 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $282 $130 Not Implemented
OK0153 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,170 $7,500 Not Implemented
PV0001 # 01 Y:1985 01 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,125 $1,659 Not Implemented
PV0001 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $499 $666 Not Implemented
PV0001 # 03 Y:1985 03 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,276 $1,271 Not Implemented
PV0002 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $375 $79 Not Implemented
PV0002 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,792 $10 Not Implemented
PV0002 # 03 Y:1985 03 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,393 $0 Not Implemented
MA0016 # 01 Y:1985 01 1985 AIR CONDITION ONLY SPACE NECESSARY $7,772 $5,000 Implemented
MA0016 # 02 Y:1985 02 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,480 $3,178 Implemented
MA0016 # 03 Y:1985 03 1985 INSTALL SET-BACK TIMERS $453 $101 Implemented