Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,686
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0165 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,520 | $21,000 | Not Implemented |
UD0165 # 03 Y:1985 | 03 | 1985 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,623 | $250 | Not Implemented |
UD0165 # 04 Y:1985 | 04 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,000 | Implemented |
UD0165 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,934 | $4,600 | Implemented |
UD0165 # 06 Y:1985 | 06 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,435 | $0 | Implemented |
UD0165 # 07 Y:1985 | 07 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,848 | $1,500 | Implemented |
TN0248 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,966 | $375 | Implemented |
TN0248 # 02 Y:1985 | 02 | 1985 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,354 | $4,000 | Implemented |
TN0248 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $1,628 | $800 | Implemented |
TN0248 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $1,044 | $750 | Implemented |
TN0248 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $354 | $399 | Not Implemented |
TN0248 # 06 Y:1985 | 06 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $967 | $0 | Implemented |
TN0248 # 07 Y:1985 | 07 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $457 | $500 | Implemented |
AT0005 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $490 | $1,183 | Implemented |
AT0005 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,390 | $300 | Implemented |
AT0005 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $291 | $400 | Implemented |
AT0005 # 04 Y:1985 | 04 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,384 | $226 | Implemented |
AT0005 # 05 Y:1985 | 05 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $346 | $0 | Not Implemented |
AT0005 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $24,347 | $1,200 | Implemented |
TN0247 # 01 Y:1985 | 01 | 1985 | REDESIGN PROCESS | $8,108 | $2,000 | Implemented |
TN0247 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,753 | $135 | Implemented |
TN0247 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $808 | $500 | Implemented |
TS0023 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $1,342 | $4,400 | Not Implemented |
TS0023 # 02 Y:1985 | 02 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,162 | $0 | Not Implemented |
TS0023 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $0 | Not Implemented |