IAC logo
IAC Assessment: UD0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product REFRACTORY PRODUCTS
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,370 6,228,898 kWh $0.06
Natural Gas $486,720 87,871 MMBtu $5.54
TOTAL ENERGY COSTS $836,090
RECOMMENDED SAVINGS* $60,066 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,352
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$33,571
Cost:
$100,000
- - $33,571 7,143 -
-
kWh
$33,571
7,143
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,520
Cost:
$21,000
- - $11,520 2,400 -
-
kWh
$11,520
2,400
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,623
Cost:
$250
$2,623 9,086 - - $2,623
9,086
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,135
Cost:
$2,000
- - $1,135 237 -
-
kWh
$1,135
237
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,934
Cost:
$4,600
- - $2,934 615 -
-
kWh
$2,934
615
MMBtu
06: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$3,435
Cost:
-
$263 10,258 $3,172 675 $263
10,258
kWh
$3,172
675
MMBtu
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,848
Cost:
$1,500
$4,848 - - - $4,848
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$60,066
Cost:
$129,350
$7,734 19,344 $52,332 11,070 $7,734
19,344
kWh
$52,332
11,070
MMBtu
TOTAL IMPLEMENTED Savings:
$12,352
Cost:
$8,100
$5,111 10,258 $7,241 1,527 $5,111
10,258
kWh
$7,241
1,527
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas