IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,208

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0143 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,945 $12,879 Not Implemented
WM0143 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,367 $6,400 Not Implemented
WM0143 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $5,586 $0 Not Implemented
WM0143 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,884 $4,500 Implemented
WM0143 # 05 Y:2019 05 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $3,255 $0 Not Implemented
WM0143 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,250 $0 Not Implemented
WM0143 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,164 $1,500 Not Implemented
WM0143 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,815 $2,460 Not Implemented
WM0143 # 09 Y:2019 09 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,598 $2,000 Not Implemented
WM0143 # 10 Y:2019 10 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,438 $928 Not Implemented
WM0143 # 11 Y:2019 11 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,240 $748 Not Implemented
WM0143 # 12 Y:2019 12 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $979 $0 Not Implemented
UA0217 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,041 $3,585 Not Implemented
UA0217 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,933 $50 Not Implemented
UA0217 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,395 Implemented
UA0217 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,500 $104,362 Not Implemented
UA0217 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $856 $922 Not Implemented
UA0217 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,941 $50 Implemented
UA0217 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $3,995 $3,320 Not Implemented
LS1916 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,663 $250 Not Implemented
LS1916 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $569 $50 Not Implemented
LS1916 # 03 Y:2019 03 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $394 $38 Not Implemented
LS1916 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $105 $50 Not Implemented
LS1916 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $810 Not Implemented
LS1916 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $129 $104 Not Implemented