IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0426 # 09 Y:1990 09 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,331 $0 Implemented
GT0406 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $772 $2,430 Not Implemented
GT0406 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,787 $14,000 Not Implemented
GT0406 # 03 Y:1990 03 1990 USE OPTIMUM THICKNESS INSULATION $5,930 $98 Not Implemented
GT0406 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,920 $815 Not Implemented
GT0406 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $3,390 $0 Not Implemented
GT0406 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,125 $1,633 Not Implemented
GT0406 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,678 $21,372 Not Implemented
GT0297 # 01 Y:1986 01 1986 USE MINIMUM SAFE OVEN VENTILATION $64,300 $2,000 Not Implemented
GT0297 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $1,000 Implemented
GT0297 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,120 $1,200 Implemented
GT0297 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,830 $7,920 Implemented
GT0297 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,700 $18,700 Implemented
GT0297 # 06 Y:1986 06 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,209 $3,516 Implemented
GT0284 # 01 Y:1986 01 1986 COVER OPEN TANKS $48,372 $11,000 Not Implemented
GT0284 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $3,120 $2,388 Not Implemented
GT0284 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $184 Implemented
GT0267 # 01 Y:1985 01 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,275 $3,300 Not Implemented
GT0267 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $1,200 $16,250 Not Implemented
GT0267 # 03 Y:1985 03 1985 COVER OPEN TANKS $3,200 $600 Implemented
GT0267 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $450 Implemented
GT0267 # 05 Y:1985 05 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,968 $3,547 Not Implemented
GT0267 # 06 Y:1985 06 1985 AIR CONDITION ONLY SPACE NECESSARY $1,860 $1,000 Implemented
GT0262 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,780 $500 Implemented
GT0262 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $92 $27 Implemented