Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,009
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0239 # 04 Y:2025 | 04 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,613 | $840 | n/a |
WM0239 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,028 | $22,500 | n/a |
WM0239 # 05 Y:2025 | 05 | 2025 | INSTALL REPLACEMENT DOORS | $2,866 | $4,605 | n/a |
WM0239 # 01 Y:2025 | 01 | 2025 | USE SYNTHETIC LUBRICANT | $40,192 | $23,257 | n/a |
WM0239 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,251 | $3,566 | n/a |
WM0239 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,167 | $2,240 | n/a |
WM0229 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,880 | $1,455 | n/a |
WM0229 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $476 | $460 | n/a |
WM0229 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,572 | $0 | n/a |
WM0229 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,336 | $0 | n/a |
WM0229 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,865 | $3,500 | n/a |
WM0229 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $129 | n/a |
MZ0366 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,343 | $2,297,063 | n/a |
MZ0366 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,674 | $14,000 | n/a |
MZ0366 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,668 | $59,968 | n/a |
MZ0366 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,395 | $800 | n/a |
MZ0366 # 01 Y:2024 | 01 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $21,410 | $168,000 | n/a |
NL0096 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,899 | $11,800 | n/a |
NL0096 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $58,179 | $20,000 | n/a |
NL0096 # 05 Y:2024 | 05 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $20,701 | $600 | n/a |
NL0096 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,679 | $4,600 | n/a |
NL0096 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $45,060 | $54,620 | n/a |
NL0096 # 04 Y:2024 | 04 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $37,143 | $3,000 | n/a |
NL0096 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,407 | $21,500 | n/a |
NL0096 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,634 | $1,540 | n/a |