IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

968

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0182 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,359 Not Implemented
OR0182 # 05 Y:1993 05 1993 OPTIMIZE PLANT POWER FACTOR $1,458 $2,700 Implemented
OR0182 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $200 $994 Implemented
KU0398 # 01 Y:1993 01 1993 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $45,950 $48,000 Not Implemented
KU0398 # 02 Y:1993 02 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,158 $19,000 Not Implemented
KU0398 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,620 $2,000 Implemented
KU0398 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,875 $2,875 Implemented
KU0398 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,003 $19,646 Implemented
KU0398 # 06 Y:1993 06 1993 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,349 $700 Implemented
KU0398 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $0 Implemented
KU0398 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $835 $400 Not Implemented
KU0398 # 09 Y:1993 09 1993 INSTALL OCCUPANCY SENSORS $769 $1,260 Not Implemented
KU0398 # 10 Y:1993 10 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $10 Implemented
AM0159 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $9,900 $26,500 Implemented
AM0159 # 02 Y:1992 02 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,980 $22,500 Not Implemented
AM0159 # 03 Y:1992 03 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,680 $14,340 Not Implemented
AM0159 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $2,200 $0 Implemented
AM0159 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $490 $690 Not Implemented
AM0159 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $244 $440 Implemented
AS0040 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,811 $2,794 Implemented
AS0040 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,154 $0 Implemented
AS0040 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,134 $2,543 Implemented
AS0040 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,889 $1,000 Implemented
AS0040 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,948 $0 Implemented
AS0040 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,041 $500 Implemented