IAC Assessment: UD0430
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0430
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1994
Principal Product reconditioned steel drums
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 35,000
Annual Production 370,000 Pieces
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,010 1,640,973 kWh $0.08
Natural Gas $121,805 47,725 MMBtu $2.55
TOTAL ENERGY COSTS $245,815
RECOMMENDED SAVINGS* $104,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,575
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Other Energy Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ MMBtu $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$5,693
Cost:
$10,000
$5,693 172,040 - - - - - - - - $5,693
172,040
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,425
Cost:
$5,000
- - $2,425 980 - - - - - - -
-
kWh
$2,425
980
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,410
Cost:
$2,106
$2,410 72,685 - - - - - - - - $2,410
72,685
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$268
Cost:
$500
- - - - - - $268 268 - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$268
268
MMBtu
-
-
$
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,919
Cost:
$5,000
- - $2,919 1,003 - - - - - - -
-
kWh
$2,919
1,003
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.8112 COMBINE UTILITY METERS Savings:
$89,640
Cost:
$40,000
- - $1,680 577 $(-3,000) (-555) - - $90,960 - -
-
kWh
$1,680
577
MMBtu
$(-3,000)
(-555)
MMBtu
-
-
MMBtu
$90,960
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$645
Cost:
$500
- - $645 261 - - - - - - -
-
kWh
$645
261
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$104,000
Cost:
$63,106
$8,103 244,725 $7,669 2,821 $(-3,000) (-555) $268 268 $90,960 - $8,103
244,725
kWh
$7,669
2,821
MMBtu
$(-3,000)
(-555)
MMBtu
$268
268
MMBtu
$90,960
-
$
TOTAL IMPLEMENTED Savings:
$101,575
Cost:
$58,106
$8,103 244,725 $5,244 1,841 $(-3,000) (-555) $268 268 $90,960 - $8,103
244,725
kWh
$5,244
1,841
MMBtu
$(-3,000)
(-555)
MMBtu
$268
268
MMBtu
$90,960
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Other Energy Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Other Energy Administrative Changes