Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1994 |
Principal Product | reconditioned steel drums |
NAICS | n/a |
SIC | 3412 - Metal Barrels, Drums, And Pails |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 370,000 Pieces |
Production Hrs. Annual | 4,500 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $124,010 | 1,640,973 | kWh | $0.08 |
Natural Gas | $121,805 | 47,725 | MMBtu | $2.55 |
TOTAL ENERGY COSTS | $245,815 | |||
RECOMMENDED SAVINGS* | $104,000 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $101,575 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $5,693 Cost: $10,000 |
$5,693 | 172,040 | - | - | - | - | - | - | - | - |
$5,693 172,040 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,425 Cost: $5,000 |
- | - | $2,425 | 980 | - | - | - | - | - | - |
- - kWh |
$2,425 980 MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,410 Cost: $2,106 |
$2,410 | 72,685 | - | - | - | - | - | - | - | - |
$2,410 72,685 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $268 Cost: $500 |
- | - | - | - | - | - | $268 | 268 | - | - |
- - kWh |
- - MMBtu |
- - MMBtu |
$268 268 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $2,919 Cost: $5,000 |
- | - | $2,919 | 1,003 | - | - | - | - | - | - |
- - kWh |
$2,919 1,003 MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8112 COMBINE UTILITY METERS |
Savings: $89,640 Cost: $40,000 |
- | - | $1,680 | 577 | $(-3,000) | (-555) | - | - | $90,960 | - |
- - kWh |
$1,680 577 MMBtu |
$(-3,000) (-555) MMBtu |
- - MMBtu |
$90,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $645 Cost: $500 |
- | - | $645 | 261 | - | - | - | - | - | - |
- - kWh |
$645 261 MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,000 Cost: $63,106 |
$8,103 | 244,725 | $7,669 | 2,821 | $(-3,000) | (-555) | $268 | 268 | $90,960 | - | $8,103 244,725 kWh |
$7,669 2,821 MMBtu |
$(-3,000) (-555) MMBtu |
$268 268 MMBtu |
$90,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $101,575 Cost: $58,106 |
$8,103 | 244,725 | $5,244 | 1,841 | $(-3,000) | (-555) | $268 | 268 | $90,960 | - | $8,103 244,725 kWh |
$5,244 1,841 MMBtu |
$(-3,000) (-555) MMBtu |
$268 268 MMBtu |
$90,960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Other Energy | Administrative Changes |