IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0302 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,308 $30 n/a
AS0302 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $753 $398 n/a
AS0302 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $8,700 $14,940 n/a
AS0302 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $2,853 n/a
AS0302 # 07 Y:2001 07 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,740 $4,200 n/a
AS0302 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $147 $450 n/a
AS0302 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $47,510 $360 n/a
AS0302 # 08 Y:2001 08 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $386,784 $145,968 n/a
AS0232 # 09 Y:1998 09 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,710 $46,000 Not Implemented
AS0232 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $300,000 $80,000 Not Implemented
AS0232 # 07 Y:1998 07 1998 CLEAR AND RENT EXISTING SPACE $27,050 $3,600 Not Implemented
AS0232 # 06 Y:1998 06 1998 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,269 $9,500 Not Implemented
AS0232 # 01 Y:1998 01 1998 INSTALL OCCUPANCY SENSORS $528 $750 Not Implemented
AS0232 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,829 $20,012 Implemented
AS0232 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $141,064 $100,000 Not Implemented
AS0232 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,577 $785 Implemented
AS0232 # 05 Y:1998 05 1998 UPGRADE CONVEYORS $3,611 $10,240 Not Implemented
AS0040 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,154 $0 Implemented
AS0040 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,134 $2,543 Implemented
AS0040 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,948 $0 Implemented
AS0040 # 13 Y:1991 13 1991 INSULATE BARE EQUIPMENT $33,741 $18,360 Implemented
AS0040 # 12 Y:1991 12 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,916 $2,500 Implemented
AS0040 # 11 Y:1991 11 1991 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $190,214 $0 Implemented
AS0040 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,041 $500 Implemented
AS0040 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $537 $776 Implemented