Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0302 # 04 Y:2001 | 04 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,308 | $30 | n/a |
AS0302 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $753 | $398 | n/a |
AS0302 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $8,700 | $14,940 | n/a |
AS0302 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $872 | $2,853 | n/a |
AS0302 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,740 | $4,200 | n/a |
AS0302 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $147 | $450 | n/a |
AS0302 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $47,510 | $360 | n/a |
AS0302 # 08 Y:2001 | 08 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $386,784 | $145,968 | n/a |
AS0232 # 09 Y:1998 | 09 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,710 | $46,000 | Not Implemented |
AS0232 # 08 Y:1998 | 08 | 1998 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $300,000 | $80,000 | Not Implemented |
AS0232 # 07 Y:1998 | 07 | 1998 | CLEAR AND RENT EXISTING SPACE | $27,050 | $3,600 | Not Implemented |
AS0232 # 06 Y:1998 | 06 | 1998 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,269 | $9,500 | Not Implemented |
AS0232 # 01 Y:1998 | 01 | 1998 | INSTALL OCCUPANCY SENSORS | $528 | $750 | Not Implemented |
AS0232 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,829 | $20,012 | Implemented |
AS0232 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $141,064 | $100,000 | Not Implemented |
AS0232 # 04 Y:1998 | 04 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,577 | $785 | Implemented |
AS0232 # 05 Y:1998 | 05 | 1998 | UPGRADE CONVEYORS | $3,611 | $10,240 | Not Implemented |
AS0040 # 02 Y:1991 | 02 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $0 | Implemented |
AS0040 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,134 | $2,543 | Implemented |
AS0040 # 05 Y:1991 | 05 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,948 | $0 | Implemented |
AS0040 # 13 Y:1991 | 13 | 1991 | INSULATE BARE EQUIPMENT | $33,741 | $18,360 | Implemented |
AS0040 # 12 Y:1991 | 12 | 1991 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,916 | $2,500 | Implemented |
AS0040 # 11 Y:1991 | 11 | 1991 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $190,214 | $0 | Implemented |
AS0040 # 06 Y:1991 | 06 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,041 | $500 | Implemented |
AS0040 # 09 Y:1991 | 09 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $537 | $776 | Implemented |