IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0293 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $1,110 Implemented
IC0293 # 07 Y:2024 07 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $137 $495 Not Implemented
IC0293 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,336 $6,391 Implemented
IC0293 # 05 Y:2024 05 2024 USE OPTIMUM THICKNESS INSULATION $17,140 $38,685 Implemented
IC0293 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $384 $338 Implemented
IC0293 # 08 Y:2024 08 2024 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,219 $3,519 Implemented
IC0293 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $341,931 $2,037,172 Not Implemented
IC0293 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,885 $54,145 Not Implemented
IC0242 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,050 $2,715 Not Implemented
IC0242 # 02 Y:2020 02 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,255 $10,230 Not Implemented
IC0242 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,538 $5,100 Not Implemented
IC0242 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,839 $0 Not Implemented
IC0242 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,675 $4,640 Not Implemented
IC0242 # 06 Y:2020 06 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $9,655 $0 Not Implemented
IC0165 # 07 Y:2009 07 2009 $6,833 $45,400 Implemented
IC0165 # 03 Y:2009 03 2009 $3,581 $0 Implemented
IC0165 # 08 Y:2009 08 2009 $465 $0 Not Implemented
IC0165 # 04 Y:2009 04 2009 $573 $575 Implemented
IC0165 # 06 Y:2009 06 2009 $41,095 $2,038 Not Implemented
IC0165 # 01 Y:2009 01 2009 $35 $81 Not Implemented
IC0165 # 02 Y:2009 02 2009 $56 $152 Not Implemented
IC0165 # 05 Y:2009 05 2009 $197 $485 Implemented
BD0330 # 10 Y:2007 10 2007 USE RADIANT HEATER FOR SPOT HEATING $81,923 $0 Not Implemented
BD0330 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,117 $0 Not Implemented
BD0330 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $621 $0 Not Implemented