Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 341 | Metal Cans And Shipping Containers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0104 # 02 Y:1987 | 02 | 1987 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,596 | $1,900 | Not Implemented |
MA0104 # 03 Y:1987 | 03 | 1987 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,988 | $9,900 | Implemented |
MA0104 # 04 Y:1987 | 04 | 1987 | INSULATE BARE EQUIPMENT | $821 | $1,968 | Not Implemented |
MA0104 # 05 Y:1987 | 05 | 1987 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,962 | $6,000 | Implemented |
MA0104 # 06 Y:1987 | 06 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,321 | $1,099 | Implemented |
MA0104 # 01 Y:1987 | 01 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,941 | $0 | Implemented |
OR0007 # 06 Y:1987 | 06 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,065 | $5,550 | Not Implemented |
OR0007 # 11 Y:1987 | 11 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,933 | $8,957 | Not Implemented |
OR0007 # 10 Y:1987 | 10 | 1987 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $49 | $80 | Not Implemented |
OR0007 # 09 Y:1987 | 09 | 1987 | OPTIMIZE PLANT POWER FACTOR | $2,736 | $2,420 | Implemented |
OR0007 # 08 Y:1987 | 08 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,413 | $3,346 | Not Implemented |
OR0007 # 07 Y:1987 | 07 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $8,339 | $6,586 | Not Implemented |
OR0007 # 05 Y:1987 | 05 | 1987 | INSULATE BARE EQUIPMENT | $677 | $168 | Not Implemented |
OR0007 # 04 Y:1987 | 04 | 1987 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,646 | $1,700 | Not Implemented |
OR0007 # 03 Y:1987 | 03 | 1987 | REDUCE VENTILATION AIR | $4,062 | $11 | Implemented |
OR0007 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $345 | $0 | Implemented |
OR0007 # 01 Y:1987 | 01 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,816 | $20 | Implemented |
RU0002 # 01 Y:1987 | 01 | 1987 | IMPROVE LUBRICATION PRACTICES | $22,514 | $0 | Implemented |
RU0002 # 02 Y:1987 | 02 | 1987 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $30,280 | $32,000 | Implemented |
RU0002 # 03 Y:1987 | 03 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,433 | $5,670 | Implemented |
RU0002 # 04 Y:1987 | 04 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,800 | $178 | Implemented |
RU0002 # 05 Y:1987 | 05 | 1987 | INSULATE BARE EQUIPMENT | $9,437 | $6,204 | Not Implemented |
RU0002 # 06 Y:1987 | 06 | 1987 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,751 | $0 | Implemented |