IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 341 Metal Cans And Shipping Containers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0104 # 02 Y:1987 02 1987 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $13,596 $1,900 Not Implemented
MA0104 # 03 Y:1987 03 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,988 $9,900 Implemented
MA0104 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $821 $1,968 Not Implemented
MA0104 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,962 $6,000 Implemented
MA0104 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,321 $1,099 Implemented
MA0104 # 01 Y:1987 01 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,941 $0 Implemented
OR0007 # 06 Y:1987 06 1987 RECOVER WASTE HEAT FROM EQUIPMENT $7,065 $5,550 Not Implemented
OR0007 # 11 Y:1987 11 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,933 $8,957 Not Implemented
OR0007 # 10 Y:1987 10 1987 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $49 $80 Not Implemented
OR0007 # 09 Y:1987 09 1987 OPTIMIZE PLANT POWER FACTOR $2,736 $2,420 Implemented
OR0007 # 08 Y:1987 08 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,413 $3,346 Not Implemented
OR0007 # 07 Y:1987 07 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,339 $6,586 Not Implemented
OR0007 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $677 $168 Not Implemented
OR0007 # 04 Y:1987 04 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,646 $1,700 Not Implemented
OR0007 # 03 Y:1987 03 1987 REDUCE VENTILATION AIR $4,062 $11 Implemented
OR0007 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $345 $0 Implemented
OR0007 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,816 $20 Implemented
RU0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $22,514 $0 Implemented
RU0002 # 02 Y:1987 02 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $30,280 $32,000 Implemented
RU0002 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,433 $5,670 Implemented
RU0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $178 Implemented
RU0002 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $9,437 $6,204 Not Implemented
RU0002 # 06 Y:1987 06 1987 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,751 $0 Implemented