IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0457 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,450 $0 Not Implemented
GT0457 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $800 Not Implemented
GT0457 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,540 $0 Not Implemented
GT0457 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $5,540 $3,900 Not Implemented
UD0358 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,464 $7,000 Implemented
UD0358 # 02 Y:1991 02 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $675 $0 Implemented
UD0358 # 03 Y:1991 03 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,145 $200 Implemented
UD0358 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,170 $0 Implemented
UD0358 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,636 $0 Implemented
UD0358 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $959 $0 Implemented
AS0030 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $432 $63 Not Implemented
AS0030 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,895 $500 Not Implemented
AS0030 # 03 Y:1991 03 1991 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,235 $2,000 Not Implemented
AS0030 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29 $72 Not Implemented
AS0030 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $349 $0 Not Implemented
UD0342 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $9,819 $0 Not Implemented
UD0342 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,238 $0 Not Implemented
UD0342 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,746 $0 Not Implemented
UD0342 # 04 Y:1991 04 1991 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,611 $2,000 Not Implemented
UD0342 # 05 Y:1991 05 1991 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,474 $11,865 Not Implemented
WI0111 # 01 Y:1991 01 1991 IMPROVE LUBRICATION PRACTICES $4,375 $0 Not Implemented
WI0111 # 02 Y:1991 02 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,019 $0 Not Implemented
WI0111 # 03 Y:1991 03 1991 INSTALL STORM WINDOWS AND DOORS $2,291 $8,000 Not Implemented
WI0111 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,002 $0 Not Implemented
WI0111 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $601 $500 Not Implemented