IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,203

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0153 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,170 $7,500 Not Implemented
TS0018 # 01 Y:1985 01 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,252 $23,421 Not Implemented
TS0018 # 02 Y:1985 02 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,124 $0 Not Implemented
TS0018 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,974 $5,200 Not Implemented
MA0017 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $466 $200 Implemented
MA0017 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $106 $165 Implemented
MA0017 # 03 Y:1985 03 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,605 $0 Implemented
MA0017 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $114 Implemented
OK0122 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,546 $346 Not Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented
OK0122 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,414 $290 Implemented
OK0122 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,584 $2,024 Implemented
OK0122 # 06 Y:1984 06 1984 AIR CONDITION ONLY SPACE NECESSARY $272 $70 Not Implemented
OK0122 # 07 Y:1984 07 1984 REDUCE VENTILATION AIR $316 $40 Implemented
OK0122 # 08 Y:1984 08 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $435 $693 Implemented
OK0122 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,840 $9,307 Implemented
OK0122 # 10 Y:1984 10 1984 OPTIMIZE PLANT POWER FACTOR $1,680 $6,550 Not Implemented
TN0193 # 01 Y:1983 01 1983 REVISE SMOKE CLEANUP FROM OPERATIONS $657 $2,772 Implemented
TN0193 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,146 $800 Not Implemented
TN0193 # 03 Y:1983 03 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $175 $0 Implemented
TN0193 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $730 $529 Implemented
KU0093 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,313 $35,000 Not Implemented
KU0093 # 02 Y:1983 02 1983 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $7,691 $300 Not Implemented
KU0093 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $5,773 $3,300 Implemented