Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 342 | Cutlery, Handtools, And Hardware |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0398 # 01 Y:1993 | 01 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,277 | $0 | Not Implemented |
UD0398 # 02 Y:1993 | 02 | 1993 | REDUCE FLUID FLOW RATES | $7,396 | $5,000 | Implemented |
UD0398 # 04 Y:1993 | 04 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $156 | $200 | Implemented |
UD0398 # 05 Y:1993 | 05 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,539 | $0 | Not Implemented |
UD0398 # 06 Y:1993 | 06 | 1993 | UPGRADE CONTROLS ON COMPRESSORS | $5,166 | $800 | Implemented |
UD0398 # 03 Y:1993 | 03 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,240 | $40,000 | Not Implemented |
UD0358 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,636 | $0 | Implemented |
UD0358 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,170 | $0 | Implemented |
UD0358 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $959 | $0 | Implemented |
UD0358 # 02 Y:1991 | 02 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $675 | $0 | Implemented |
UD0358 # 01 Y:1991 | 01 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,464 | $7,000 | Implemented |
UD0358 # 03 Y:1991 | 03 | 1991 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $2,145 | $200 | Implemented |
UD0342 # 04 Y:1991 | 04 | 1991 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $1,611 | $2,000 | Not Implemented |
UD0342 # 03 Y:1991 | 03 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,746 | $0 | Not Implemented |
UD0342 # 02 Y:1991 | 02 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,238 | $0 | Not Implemented |
UD0342 # 01 Y:1991 | 01 | 1991 | OPTIMIZE PLANT POWER FACTOR | $9,819 | $0 | Not Implemented |
UD0342 # 05 Y:1991 | 05 | 1991 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,474 | $11,865 | Not Implemented |
UD0302 # 01 Y:1990 | 01 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,135 | $0 | Implemented |
UD0302 # 02 Y:1990 | 02 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,863 | $4,000 | Implemented |
UD0302 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,311 | $0 | Not Implemented |
UD0302 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $795 | $0 | Not Implemented |
UD0302 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $700 | Not Implemented |
UD0302 # 06 Y:1990 | 06 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,637 | $7,500 | Not Implemented |
UD0252 # 06 Y:1988 | 06 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,267 | $4,098 | Implemented |
UD0252 # 05 Y:1988 | 05 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $665 | $728 | Not Implemented |