IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 342 Cutlery, Handtools, And Hardware
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0075 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $595 $400 Implemented
LT0075 # 03 Y:1986 03 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $123 $0 Implemented
LT0075 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $395 $309 Implemented
LT0075 # 05 Y:1986 05 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $532 $200 Implemented
LT0075 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $150 Implemented
MA0057 # 02 Y:1986 02 1986 REDUCE GLAZED AREAS IN BUILDINGS $3,959 $8,455 Implemented
MA0057 # 05 Y:1986 05 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $2,262 $7,500 Implemented
MA0057 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,512 $0 Not Implemented
MA0057 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $377 $300 Implemented
MA0057 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $2,500 Implemented
ST0053 # 01 Y:1986 01 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $500 Not Implemented
ST0053 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,959 $140 Implemented
ST0053 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $2,164 $250 Not Implemented
ST0053 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $100 Not Implemented
ST0053 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $1,204 $400 Not Implemented
ST0053 # 06 Y:1986 06 1986 INSULATE BARE EQUIPMENT $1,220 $650 Not Implemented
ST0053 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,391 $554 Not Implemented
ST0053 # 08 Y:1986 08 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,913 $0 Implemented
KU0187 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $136 $0 Implemented
KU0187 # 05 Y:1986 05 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $231 $0 Implemented
KU0187 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $684 $1,200 Not Implemented
KU0187 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $218 $0 Implemented
KU0187 # 02 Y:1986 02 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,550 $2,000 Implemented
KU0187 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,097 $193 Implemented