Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0906 # 07 Y:2015 07 2015 USE RADIANT HEATER FOR SPOT HEATING $3,385 $15,625 Not Implemented
OK0906 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $1,362 $0 Not Implemented
OK0906 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $727 $2,651 Not Implemented
OK0906 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $1,977 $2,220 Not Implemented
OK0906 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,273 $600 Implemented
OK0906 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,040 $1,751 Not Implemented
OK0906 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $276 $1,202 Not Implemented
OK0814 # 05 Y:2011 05 2011 ADJUST BURNERS FOR EFFICIENT OPERATION $23,113 $11,400 Not Implemented
OK0814 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,049 $15,319 Implemented
OK0814 # 03 Y:2011 03 2011 INSTALL EQUIPMENT TO MOVE PRODUCT $1,364,602 $235,960 Implemented
OK0814 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $189,220 $20,000 Implemented
OK0814 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $262,832 $1,710,000 Implemented
OK0153 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $282 $130 Not Implemented
OK0153 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $75 Implemented
OK0153 # 02 Y:1985 02 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $580 $300 Not Implemented
OK0153 # 03 Y:1985 03 1985 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $104 $259 Not Implemented
OK0153 # 05 Y:1985 05 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,170 $7,500 Not Implemented
OK0122 # 08 Y:1984 08 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $435 $693 Implemented
OK0122 # 10 Y:1984 10 1984 OPTIMIZE PLANT POWER FACTOR $1,680 $6,550 Not Implemented
OK0122 # 07 Y:1984 07 1984 REDUCE VENTILATION AIR $316 $40 Implemented
OK0122 # 06 Y:1984 06 1984 AIR CONDITION ONLY SPACE NECESSARY $272 $70 Not Implemented
OK0122 # 05 Y:1984 05 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,584 $2,024 Implemented
OK0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $923 Implemented
OK0122 # 02 Y:1984 02 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $649 $235 Implemented
OK0122 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,546 $346 Not Implemented