IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3429 Hardware, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0784 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,015 $1,782 Not Implemented
GT0784 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,866 $1,000 Implemented
GT0784 # 10 Y:2004 10 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $14,204 $29,000 Not Implemented
GT0784 # 09 Y:2004 09 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,685 $4,550 Not Implemented
GT0784 # 08 Y:2004 08 2004 METER WASTE WATER $4,010 $1,100 Implemented
GT0784 # 07 Y:2004 07 2004 MINIMIZE WATER USAGE $7,400 $1,840 Implemented
GT0784 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $40,320 $5,000 Not Implemented
GT0784 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $51,264 $0 Not Implemented
GT0784 # 04 Y:2004 04 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $14,255 $35,020 Not Implemented
GT0784 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $20,500 $1,200 Implemented
TN0409 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,788 $2,100 Implemented
TN0409 # 07 Y:1990 07 1990 INSULATE BARE EQUIPMENT $1,728 $985 Not Implemented
TN0409 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,998 $1,000 Implemented
TN0409 # 05 Y:1990 05 1990 REPAIR AND ELIMINATE STEAM LEAKS $2,480 $1,050 Implemented
TN0409 # 04 Y:1990 04 1990 CLOSE OFF UNNEEDED STEAM LINES $4,993 $0 Implemented
TN0409 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,393 $1,230 Implemented
TN0409 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $14,470 $1,335 Implemented
TN0409 # 01 Y:1990 01 1990 KEEP LAMPS AND REFLECTORS CLEAN $31,973 $43,388 Implemented
TN0409 # 09 Y:1990 09 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $498 $138 Implemented
TN0313 # 07 Y:1987 07 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,722 $300 Implemented
TN0313 # 06 Y:1987 06 1987 COVER OPEN TANKS $3,024 $1,651 Implemented
TN0313 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,202 $225 Implemented
TN0313 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $3,696 $972 Implemented
TN0313 # 03 Y:1987 03 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,250 $0 Implemented
TN0313 # 02 Y:1987 02 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,160 $10,750 Not Implemented