Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 2004 |
Principal Product | TOOLS |
NAICS | 332510 - Hardware Manufacturing |
SIC | 3429 - Hardware, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 61 |
Plant Area (Sq.Ft.) | 57,000 |
Annual Production | 13,000,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $241,678 | 7,192,800 | kWh | $0.03 |
Electricity Demand | $303,729 | 32,209 | kW-months/year | $9.43 |
Natural Gas | $79,414 | 7,509 | MMBtu | $10.58 |
TOTAL ENERGY COSTS | $624,821 | |||
RECOMMENDED SAVINGS* | $178,519 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $50,776 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,866 Cost: $1,000 |
$9,840 | 292,852 | $9,026 | 879 | - | - | - | - | - | - | - | - | - | - |
$9,840 292,852 kWh |
$9,026 879 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,015 Cost: $1,782 |
$2,054 | 61,142 | $1,961 | 184 | - | - | - | - | - | - | - | - | - | - |
$2,054 61,142 kWh |
$1,961 184 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $20,500 Cost: $1,200 |
- | - | - | - | $20,500 | 1,940 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$20,500 1,940 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE |
Savings: $14,255 Cost: $35,020 |
$(-43) | (-1,285) | $(-40) | 4 | - | - | - | - | - | - | $8,640 | - | $5,698 | - |
$(-43) (-1,285) kWh |
$(-40) 4 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$8,640 - $ |
$5,698 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $51,264 Cost: - |
- | - | $51,264 | 4,800 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
$51,264 4,800 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $40,320 Cost: $5,000 |
- | - | $44,640 | - | - | - | - | - | $(-4,320) | - | - | - | - | - |
- - kWh |
$44,640 - kW-months/year |
- - MMBtu |
- - Tgal |
$(-4,320) - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $7,400 Cost: $1,840 |
- | - | - | - | - | - | - | - | - | - | - | - | $7,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
$7,400 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4155 METER WASTE WATER |
Savings: $4,010 Cost: $1,100 |
- | - | - | - | - | - | $4,010 | 1,393,000 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,010 1,393,000 Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $3,685 Cost: $4,550 |
$(-3,353) | (-99,792) | - | - | $7,038 | 665 | - | - | - | - | - | - | - | - |
$(-3,353) (-99,792) kWh |
- - kW-months/year |
$7,038 665 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1111 CONTROL PRESSURE ON STEAMER OPERATIONS |
Savings: $14,204 Cost: $29,000 |
- | - | - | - | $14,204 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$14,204 - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $178,519 Cost: $80,492 |
$8,498 | 252,917 | $106,851 | 5,867 | $41,742 | 2,605 | $4,010 | 1,393,000 | $(-4,320) | - | $8,640 | - | $13,098 | - | $8,498 252,917 kWh |
$106,851 5,867 kW-months/year |
$41,742 2,605 MMBtu |
$4,010 1,393,000 Tgal |
$(-4,320) - $ |
$8,640 - $ |
$13,098 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $50,776 Cost: $5,140 |
$9,840 | 292,852 | $9,026 | 879 | $20,500 | 1,940 | $4,010 | 1,393,000 | - | - | - | - | $7,400 | - | $9,840 292,852 kWh |
$9,026 879 kW-months/year |
$20,500 1,940 MMBtu |
$4,010 1,393,000 Tgal |
- - $ |
- - $ |
$7,400 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Water Consumption |