IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

730

matching recommendations
Reset
SIC 343 Plumbing And Heating, Except Electric
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0295 # 05 Y:1986 05 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $293 $0 Not Implemented
TN0288 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,648 $0 Not Implemented
TN0288 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $881 $120 Implemented
TN0288 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $534 $0 Implemented
TN0288 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $537 $236 Implemented
TN0288 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $600 Implemented
TN0288 # 01 Y:1986 01 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,032 $8,712 Not Implemented
OK0204 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $178 $144 Implemented
OK0204 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $372 $0 Implemented
OK0204 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $545 Implemented
OK0204 # 04 Y:1986 04 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $635 $100 Implemented
OK0204 # 05 Y:1986 05 1986 INSTALL TIMERS AND/OR THERMOSTATS $690 $0 Implemented
OK0204 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $7,184 $4,000 Implemented
ST0062 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,343 $537 Implemented
ST0062 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,642 $0 Implemented
ST0062 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $0 Not Implemented
ST0062 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $716 $0 Not Implemented
ST0062 # 05 Y:1986 05 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $559 $50 Not Implemented
ST0062 # 06 Y:1986 06 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,605 $1,500 Implemented
ST0062 # 07 Y:1986 07 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,765 $651 Implemented
MA0067 # 01 Y:1986 01 1986 AIR CONDITION ONLY SPACE NECESSARY $262 $0 Implemented
MA0067 # 02 Y:1986 02 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $125 $150 Not Implemented
MA0067 # 03 Y:1986 03 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $484 $900 Implemented
MA0067 # 04 Y:1986 04 1986 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,076 $7,000 Not Implemented
MA0067 # 05 Y:1986 05 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,611 $4,710 Not Implemented