Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
271
matching recommendationsSIC | 3432 | Plumbing Fixture Fittings And Trim |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0305 # 01 Y:2024 | 01 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $8,515 | $18,062 | n/a |
IC0305 # 11 Y:2024 | 11 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $271 | $1,572 | n/a |
IC0305 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $1,737 | $2,801 | n/a |
IC0305 # 08 Y:2024 | 08 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $241 | $0 | n/a |
IC0305 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,506 | $0 | n/a |
IC0305 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,126 | $3,467 | n/a |
IC0305 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,798 | $190,030 | n/a |
IC0305 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,071 | $5,184 | n/a |
IC0305 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,145 | $2,500 | n/a |
IC0305 # 12 Y:2024 | 12 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $2,566 | n/a |
IC0305 # 10 Y:2024 | 10 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,048 | $5,899 | n/a |
IC0305 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $677 | $0 | n/a |
UA0283 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $4,924 | $754 | n/a |
UA0283 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $14,473 | $2,726 | n/a |
UA0283 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,087 | $0 | n/a |
UA0283 # 10 Y:2023 | 10 | 2023 | USE SYNTHETIC LUBRICANT | $6,907 | $21,930 | n/a |
UA0283 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $416,153 | $3,377,796 | n/a |
UA0283 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,247 | $22,655 | n/a |
UA0283 # 05 Y:2023 | 05 | 2023 | PAY BILLS ON TIME TO AVOID LATE FEES | $21,298 | $0 | n/a |
UA0283 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,686 | $750 | n/a |
UA0283 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,911 | $8,591 | n/a |
UA0283 # 11 Y:2023 | 11 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,688 | $31,108 | n/a |
UA0283 # 06 Y:2023 | 06 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,662 | $6,036 | n/a |
CL2009 # 04 Y:2020 | 04 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,407 | $23,157 | Implemented |
CL2009 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,213 | $0 | Not Implemented |