IAC logo
IAC Assessment: CL2009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product Commercial faucets & fixtures
NAICS 332913 - Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $100,000,000-$500,000,000
# of Employees 320
Plant Area (Sq.Ft.) 215,500
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,700
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,080 3,062,210 kWh $0.04
Electricity Demand $85,949 8,924 kW-months/year $9.63
Electricity Fees $14,668 - $ -
Natural Gas $49,535 6,789 MMBtu $7.30
TOTAL ENERGY COSTS $298,380
RECOMMENDED SAVINGS* $19,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,145
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,388
Cost:
$1,300
$3,385 81,573 $2,003 208 $3,385
81,573
kWh
$2,003
208
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,350
Cost:
$1,650
$3,192 76,927 $158 16 $3,192
76,927
kWh
$158
16
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,213
Cost:
-
$542 13,061 $671 70 $542
13,061
kWh
$671
70
kW-months/year
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$9,407
Cost:
$23,157
$5,845 140,851 $3,562 370 $5,845
140,851
kWh
$3,562
370
kW-months/year
TOTAL RECOMMENDED Savings:
$19,358
Cost:
$26,107
$12,964 312,412 $6,394 664 $12,964
312,412
kWh
$6,394
664
kW-months/year
TOTAL IMPLEMENTED Savings:
$18,145
Cost:
$26,107
$12,422 299,351 $5,723 594 $12,422
299,351
kWh
$5,723
594
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand