Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,546
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0321 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,220 | $2,876 | Implemented |
OK0321 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $102 | $0 | Implemented |
KU0317 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $862 | $206 | Implemented |
KU0317 # 02 Y:1990 | 02 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,455 | $240 | Implemented |
KU0317 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,311 | $1,400 | Implemented |
MO0006 # 01 Y:1990 | 01 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,585 | $171 | Implemented |
MO0006 # 03 Y:1990 | 03 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $698 | $0 | Implemented |
AS0010 # 01 Y:1990 | 01 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,459 | $0 | Implemented |
AS0010 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $591 | $758 | Implemented |
AS0010 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $3,149 | $261 | Implemented |
AS0010 # 04 Y:1990 | 04 | 1990 | INSULATE BARE EQUIPMENT | $7,665 | $2,474 | Implemented |
AS0010 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $2,587 | Implemented |
AS0010 # 07 Y:1990 | 07 | 1990 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,359 | $6,000 | Implemented |
MA0182 # 01 Y:1990 | 01 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $5,921 | $116,600 | Implemented |
MA0182 # 02 Y:1990 | 02 | 1990 | INSTALL SET-BACK TIMERS | $368 | $440 | Implemented |
MA0182 # 03 Y:1990 | 03 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $678 | $336 | Implemented |
MA0182 # 05 Y:1990 | 05 | 1990 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $471 | $675 | Implemented |
GT0408 # 02 Y:1990 | 02 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,900 | $3,771 | Implemented |
GT0408 # 03 Y:1990 | 03 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $810 | $0 | Implemented |
UD0318 # 01 Y:1990 | 01 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,002 | $0 | Implemented |
UD0318 # 02 Y:1990 | 02 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,804 | $500 | Implemented |
UD0318 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,306 | $300 | Implemented |
UD0318 # 04 Y:1990 | 04 | 1990 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,599 | $0 | Implemented |
UD0318 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,103 | $1,680 | Implemented |
CO0178 # 01 Y:1990 | 01 | 1990 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $5,140 | $600 | Implemented |