IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,546

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0321 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $8,220 $2,876 Implemented
OK0321 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102 $0 Implemented
KU0317 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $206 Implemented
KU0317 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $240 Implemented
KU0317 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,311 $1,400 Implemented
MO0006 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,585 $171 Implemented
MO0006 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $698 $0 Implemented
AS0010 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,459 $0 Implemented
AS0010 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $591 $758 Implemented
AS0010 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $3,149 $261 Implemented
AS0010 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $7,665 $2,474 Implemented
AS0010 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,125 $2,587 Implemented
AS0010 # 07 Y:1990 07 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $16,359 $6,000 Implemented
MA0182 # 01 Y:1990 01 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,921 $116,600 Implemented
MA0182 # 02 Y:1990 02 1990 INSTALL SET-BACK TIMERS $368 $440 Implemented
MA0182 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $336 Implemented
MA0182 # 05 Y:1990 05 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $471 $675 Implemented
GT0408 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $3,771 Implemented
GT0408 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $810 $0 Implemented
UD0318 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,002 $0 Implemented
UD0318 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,804 $500 Implemented
UD0318 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $300 Implemented
UD0318 # 04 Y:1990 04 1990 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,599 $0 Implemented
UD0318 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,103 $1,680 Implemented
CO0178 # 01 Y:1990 01 1990 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $5,140 $600 Implemented