IAC logo
IAC Assessment: OK0332
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0332
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1990
Principal Product HEAT EXCHANGERS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 300 Pieces
Production Hrs. Annual 8,400
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $244,645 5,961,899 kWh $0.04
Natural Gas $118,814 44,121 MMBtu $2.69
TOTAL ENERGY COSTS $363,459
RECOMMENDED SAVINGS* $19,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,277
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,937
Cost:
$900
- - $1,937 720 - - -
-
kWh
$1,937
720
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,898
Cost:
-
$5,898 - - - - - $5,898
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$98
Cost:
$102
$98 1,758 - - - - $98
1,758
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,747
Cost:
$1,641
- - $7,747 2,880 - - -
-
kWh
$7,747
2,880
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,085
Cost:
-
$2,525 90,270 - - $(-440) - $2,525
90,270
kWh
-
-
MMBtu
$(-440)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,410
Cost:
$1,070
$1,410 38,687 - - - - $1,410
38,687
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,175
Cost:
$3,713
$9,931 130,715 $9,684 3,600 $(-440) - $9,931
130,715
kWh
$9,684
3,600
MMBtu
$(-440)
-
$
TOTAL IMPLEMENTED Savings:
$13,277
Cost:
$3,713
$4,033 130,715 $9,684 3,600 $(-440) - $4,033
130,715
kWh
$9,684
3,600
MMBtu
$(-440)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes